This project required the demolition of various sizes (2” to 20”) of cast and ductile iron pipes while installing new ones. Installation of 975 LF new ductile iron pipe ranging from 6” to 24”, with a majority of the pipe to be 24”. 4 new fire hydrants at varying depths were installed. 1 new Stormtech underground storm drain system installed.
Owner: City of Falls Church, Virginia
Customer: Shirley Construction
Contract Amount: $2,050,000